Phone : +603-8957 8999

Time : Monday-Friday : 9:00am-6:00pm

Mimi

ARCHIDEX 2026 Post-Event Update

ARCHIDEX 2026 Post-Event Update TOPKRETE Showcased Waterproofing & Flooring Solutions at ARCHIDEX 2026 Event: ARCHIDEX 2026 Date: 29 July 2026 – 1 August 2026 Venue: Kuala Lumpur Convention Centre (KLCC), Malaysia TOPKRETE successfully participated in ARCHIDEX 2026, Asia’s leading architecture, interior design, and building exhibition. During the four-day event, TOPKRETE presented its advanced waterproofing, resin […]

ARCHIDEX 2026 Post-Event Update Read More »

TOPKRETE at JAPAN BUILD Osaka 2026 | Waterproofing & Flooring Solutions Japan

TOPKRETE Showcases Waterproofing & Flooring Solutions at JAPAN BUILD Osaka 2026 Event: JAPAN BUILD Osaka 2026Date: 26–28 August 2026Venue: INTEX Osaka, JapanBooth: 9-37 TOPKRETE is proud to participate in JAPAN BUILD Osaka 2026, one of Japan’s major exhibitions for the building, construction, architecture and property industries. This international exhibition provides TOPKRETE with an important platform

TOPKRETE at JAPAN BUILD Osaka 2026 | Waterproofing & Flooring Solutions Japan Read More »

Ignoring Structural Movement and Crack Behaviour in Waterproofing Design

One of the most common misunderstandings in waterproofing is the assumption that once a membrane or coating has been applied, cracks and structural movement will no longer be a problem. In reality, buildings continue to move throughout their service life. Concrete shrinks. Structures deflect. Temperature changes cause expansion and contraction. Different materials move at different

Ignoring Structural Movement and Crack Behaviour in Waterproofing Design Read More »

Data Centre ESD Epoxy Flooring Requirements and Product Selection

Why ESD Flooring Should Be Designed as a System — Not Selected by Resistance Value Alone Data centres contain some of the most sensitive and valuable electronic infrastructure in a building. Servers, control electronics, UPS systems, switchgear, communication equipment and electronic components can all be exposed to electrostatic discharge (ESD). An electrostatic charge can build

Data Centre ESD Epoxy Flooring Requirements and Product Selection Read More »

Data Centre Waterproofing Design: Critical Considerations Before Tender

Waterproofing in a Data Centre Is a Risk-Management System, Not Just a Membrane Data centres are among the most demanding buildings to waterproof. In a typical commercial development, water leakage may result in damaged finishes, complaints and repair costs. In a data centre, the same leakage can threaten electrical systems, UPS rooms, switchgear, server equipment,

Data Centre Waterproofing Design: Critical Considerations Before Tender Read More »

Insufficient Waterproofing Upstand and Termination Height – A Common Cause of Leakage

Insufficient Waterproofing Upstand and Termination Height – A Common Cause of Leakage Technical guidance for architects, engineers, specification consultants and project teams A waterproofing system may perform perfectly across a horizontal roof, balcony or podium deck, yet the building can still experience serious leakage if the waterproofing is terminated too low or incorrectly detailed. This

Insufficient Waterproofing Upstand and Termination Height – A Common Cause of Leakage Read More »

Why small waterproofing details can determine the success or failure of an entire building

Concentrating on the Main Waterproofing Area but Ignoring Critical Details When consultants review a waterproofing system, much of the attention naturally goes to the main waterproofing area: the roof slab, basement wall, podium deck, toilet floor or water tank. The drawings may show the waterproofing membrane covering thousands of square metres. The specification may clearly

Why small waterproofing details can determine the success or failure of an entire building Read More »